Shorter work units?


Advanced search

Message boards : SZTAKI Desktop Grid : Shorter work units?

AuthorMessage
Mark Reiss
Send message
Joined: Feb 13 06
Posts: 5
Credit: 7,516
RAC: 0
Message 3849 - Posted 21 Aug 2006 21:47:24 UTC

    Hi:
    I have already canncelled 2 wu for a loss of over 107 hours and 1,200 points. I am now running a 3rd wu started on or after the message of 8/8 sayingv the long wu had been deleted and new shorter ones are available. This wu is currenly at 49:26:36 for 18.80%. I am getting very fed up with this project. I am afraid that if I let this wu complete - I will not get credit for it, for some reason.

    Thank You -- Mark Reiss
    ____________

    Profile Nightbird
    Forum moderator
    Avatar
    Send message
    Joined: Jul 12 05
    Posts: 920
    Credit: 114,924
    RAC: 0
    Message 3850 - Posted 21 Aug 2006 23:35:06 UTC

      Last modified: 22 Aug 2006 0:01:46 UTC

      The message of 16/08 says that long wus can be cancelled (by you)
      The message of 7/08 says that the unsent wus have been cancelled but your third wu (wuid=38400) is not an unsent wu, it has been already sent 3 times (25/07).
      I see also that for now, nobody has reported a result.
      This (long) wu doesn\'t seem very encouraging. :(



      ____________

      Post to thread

      Message boards : SZTAKI Desktop Grid : Shorter work units?


      Home | My Account | Message Boards


      Copyright © 2017 SZTAKI Desktop Grid