What is the averge lenght of a work unit?


Advanced search

Message boards : SZTAKI Desktop Grid : What is the averge lenght of a work unit?

AuthorMessage
Profile yank
Avatar
Send message
Joined: Apr 12 08
Posts: 9
Credit: 249,155
RAC: 0
Message 7796 - Posted 8 Mar 2009 1:57:30 UTC

    I have been downing loading a few work units and the length of time varies between 4 hours and one that is 268 hours, 39 minutes, 40 second long.

    Since our team may pick, in the near future, this project to be or POTM (Project of the Month) the information about these work units are very important to some members.

    Is there a way that members can select a certain type of work unit such as the system that the CPDN project uses?
    ____________

    Profile yank
    Avatar
    Send message
    Joined: Apr 12 08
    Posts: 9
    Credit: 249,155
    RAC: 0
    Message 7799 - Posted 8 Mar 2009 2:33:34 UTC - in response to Message 7796.

      I have been downing loading a few work units and the length of time varies between 4 hours and one that is 268 hours, 39 minutes, 40 second long.

      Since our team may pick, in the near future, this project to be or POTM (Project of the Month) the information about these work units are very important to some members.

      Is there a way that members can select a certain type of work unit such as the system that the CPDN project uses?


      Just finished a work unit that had a completion time of 38 hours and it finished in a reported time of one hour, 45 minutes and 36 second.

      The work unit that had a 268 hour completion time now shows 213 to go after only 38 minutes of crunching.

      ____________

      Jesse Viviano
      Send message
      Joined: Sep 21 06
      Posts: 16
      Credit: 154,000
      RAC: 0
      Message 7800 - Posted 8 Mar 2009 4:28:53 UTC - in response to Message 7796.

        I have been downing loading a few work units and the length of time varies between 4 hours and one that is 268 hours, 39 minutes, 40 second long.

        Since our team may pick, in the near future, this project to be or POTM (Project of the Month) the information about these work units are very important to some members.

        Is there a way that members can select a certain type of work unit such as the system that the CPDN project uses?

        The NumSys Search project has extremely unpredictable runtimes, so a large runtime is given to allow the long work units to complete without exceeding the maximum computational time allowed.

        For UC Explorer work units, I cannot help you because this project is so new.

        Profile yank
        Avatar
        Send message
        Joined: Apr 12 08
        Posts: 9
        Credit: 249,155
        RAC: 0
        Message 7801 - Posted 8 Mar 2009 4:58:29 UTC

          Thank you for the information.
          ____________

          Post to thread

          Message boards : SZTAKI Desktop Grid : What is the averge lenght of a work unit?


          Home | My Account | Message Boards


          Copyright © 2017 SZTAKI Desktop Grid