Posts by Stanley A Bourdon

1) Message boards : SZTAKI Desktop Grid : New application L2.03 / W2.01 / M2.00 - Feedback (Message 4625)
Posted 4033 days ago by Stanley A Bourdon
Hi

2.01 appears to be a failure with win98. all current units failing.
2.00 were completing OK

thank you
2) Message boards : Észrevételek, tapasztalatok : Daily quota problem (Message 1533)
Posted 4332 days ago by Stanley A Bourdon
I have the problem with Quota 500 reached on BOINC 4.72 and various 5.x.x clients

today i got reached quota of 500 and the last unit i turned in on that machine was TWO days ago
3) Message boards : Észrevételek, tapasztalatok : Daily quota problem (Message 1411)
Posted 4355 days ago by Stanley A Bourdon
Hi

no the problem is not solved i still have it
4) Message boards : Észrevételek, tapasztalatok : 0 credit for a correct WU (Message 575)
Posted 4493 days ago by Stanley A Bourdon
Hi

@Adam

I am a believer in redundancy but the question is how much. If you are validating on 2 results do you really need to send out 5 work units? It seams most projects have settled on 3 units agreeing to validate and sending out 4 units initially as a safety. The science behind your project may have other needs. but if you can the lower the redundancy, that achieves the needs of the science, more work will be done by the hosts available to you.
5) Message boards : Észrevételek, tapasztalatok : PLEASE EXPLAIN THIS WORK UNIT (Message 569)
Posted 4493 days ago by Stanley A Bourdon
Hi

@Adam

please explain this workunit

<a href="http://szdg.lpds.sztaki.hu/szdg/workunit.php?wuid=1737">found here </a>.
6) Message boards : Észrevételek, tapasztalatok : 11 Dim. WU, Change Deadline? (Message 566)
Posted 4493 days ago by Stanley A Bourdon
Hi

On one hoste with a connect every .001 days and running 4.72 it works as it is suposeto downloads a workunit goesinto panic crunches long term debt goes way up and it wont download untill the longterm debt is cleared works fine

on the other hoste set at 4 days and 4.71 it should not download but it dose and so far i have been able to send the workunits back before deadline but this will not always be true . and because the long term debt is suficently positive the debt schedular has not prevented download

why are units with deadlines shorter than my connect to downloading they should not
7) Message boards : Észrevételek, tapasztalatok : PLEASE BASE CREDIT ON AN AVERAGE OF VALID WORK (Message 534)
Posted 4494 days ago by Stanley A Bourdon
HI

It apears to me that they are granting credit like most other projects now

@Philippe
http://szdg.lpds.sztaki.hu/szdg/workunit.php?wuid=1451
In this case your host reported after the work unit had been validated. It was found to be valid and granted the same credit as the three units that were used to validate.

possible solution lower your connect to setting so your units are returned sooner and are more likely to de used in the validation this solution may not apply to your situation

http://szdg.lpds.sztaki.hu/szdg/workunit.php?wuid=1291
In this case your unit that asked for high credit brought up the average and increased the granted credit for all but you.

Possible solution figure out why your computer asks for substantially higher credit than others and tell us all how we to can get it
8) Message boards : Észrevételek, tapasztalatok : PLEASE BASE CREDIT ON AN AVERAGE OF VALID WORK (Message 529)
Posted 4494 days ago by Stanley A Bourdon
Thank you
9) Message boards : Észrevételek, tapasztalatok : PLEASE BASE CREDIT ON AN AVERAGE OF VALID WORK (Message 463)
Posted 4496 days ago by Stanley A Bourdon
Hi

@Adam

Please grant credit on an average of valid results like other projects Throw out high and low and average the rest

Thank you

10) Message boards : Észrevételek, tapasztalatok : 11 Dim. WU, Change Deadline? (Message 424)
Posted 4497 days ago by Stanley A Bourdon
Hi

@Adam

One of my hosts is on dialup and to get enough work to last 2+ days I have to set my connect to every 4 days. With a one day deadline that host will not get any work. If it did get work it would often not be able to return work in time because that hosts connects at variable intervals of 18 to 48 hours.
The just over 4 day deadline was ok but for me 7 day deadline would be better.

Thank you


Next 10 posts

Home | My Account | Message Boards


Copyright © 2017 SZTAKI Desktop Grid